A light-gauge framing system made from TRUECORE® steel has breathed new life into an old 12-storey building in Lonsdale St, Melbourne.

Project Goal:

  • Add eight storeys to a 50-year-old, 12 storey building

Key Highlights/Challenges:

  • Existing structure’s ability to take additional load.
  • The age of the building meant that the grid could have been anywhere between 10mm to 30mm off, so the new steel structure had to accurately meet the existing columns.
  • There was no external access to build the walls and then clad them: all the new levels would be built without scaffolding.

Sources:

  • Carlos Cagliero, Senior project manager, Verve Construction (CC)
  • Peter Blythe, Managing director, Dynamic Steel Frame (PB)
  • Roger Schmidt, Project architect, Urban Design Architects (RS)

Key Elements:

  1. Highly modularised floor system comprising a 2.7 metre wide by 5.5 metre long fully finished floor cassette which is framed by 1mm gauge lightweight TRUECORE® steel. Each flooring cassette has four lifting points which can be craned into position and dropped on top of the structural steel of the portal frame which is composed mostly of 200mm universal beams. The cassette fixes in with screws, then it’s ready to walk on. (PB)
     
  2. Wall façades comprising a system of interlocking panels made from COLORBOND® steel in the colour Monument® and COLORBOND® Metallic steel in the colours Celestian® and Rhea®, that finish a frame of insulation and plasterboard, internally. Built off-site, these were simply lifted onto the building by crane, where they were fixed from inside into wall frames made from 1mm gauge lightweight framing made from TRUECORE® steel. (PB)
     
  3. Wall frames that allow for 10 metre-long by three metre-tall panels and no heavy structural steel was necessary to meet the walls’ engineering requirements. (PB)
     
  4. 3D modelling to ensure the system would work, and allow for a number of mechanical and plumbing services. Also to ensure appropriate joist-deflection requirements, to prevent noise transmission between floors. (CC)

Key Benefits:

  • Cost, time and safety – due to uniformity of manufactured frames, ease of handling and reduced working from heights requirements.

Summing up the project, Carlos Cagliero, Senior project manager for builders Verve Construction said:

“It’s very rare. We’re starting at 12 storeys and going up another eight and that creates a lot of logistics to deal with. We worked with Peter and his engineers at Dynamic Steel Frame to push the framing system to its full capabilities and maximise our apartment space and building value.”

Peter Blythe, managing director of Dynamic Steel Frame said:

“It would be difficult to achieve the number of floors with alternative materials such as concrete due to strength-to-weight ratios. Due to its weight above the existing building if we were to use concrete we would have only been able to go up one or two levels. With our lightweight steel framing made from BlueScope’s TRUECORE® steel the client was able to go far higher than that. They are definitely very happy about it.”

Acknowledgements

Source:
BlueScope media release
Project:
388 Lonsdale Street Location: Melbourne, Victoria
Client:
Aurumstone
Architect:
Urban Design Architects
Project Team:
Roger Schmidt, Martyn Tribe, Rob Gordon
Principal Steel Products: :
Framing: 1mm gauge lightweight framing made from TRUECORE® steel; Structural steel: 200mm UBs; Walling made from COLORBOND® steel in the colour Monument® and COLORBOND® Metallic steel in the colours Celestian® and Rhea®
Developer:
Aurumstone
Builder:
Verve Construction
Steel Fabricator:
Dynamic Steel Frame
Structural Engineer:
Irwin Consult

Not all products featured in this case study are suitable for every application, project and environment. You should confirm the suitability of particular products for your project by contacting the suppliers directly and by obtaining information and advice specific to your circumstances. The statements, information and opinions quoted in this case study are provided by the listed sources and are a reflection of their views and experience on the above project. Please refer to the Terms of Use for further details.